Please use this identifier to cite or link to this item: https://essuir.sumdu.edu.ua/handle/123456789/93158
Or use following links to share this resource in social networks: Recommend this item
Title Refinement of the process capability index calculation
Authors Haievskyi, O.
Kvasnytskyi, V.
Haievskyi, V.
Szymura, M.
Sviridova, L.
ORCID
Keywords statistical process control
Shewhart control chart
control limit
specification limit
Type Article
Date of Issue 2023
URI https://essuir.sumdu.edu.ua/handle/123456789/93158
Publisher Sumy State University
License Creative Commons Attribution - NonCommercial 4.0 International
Citation Haievskyi O., Kvasnytskyi V., Haievskyi V., Szymura M., Sviridova L. (2023). Refinement of the process capability index calculation. Journal of Engineering Sciences (Ukraine), Vol. 10(2), pp. B8–B15, doi: 10.21272/jes.2023.10(2).b2
Abstract The variability of product performance is the reason for the introduction of special methods to ensure product quality, particularly statistical methods. These include introducing statistical process control (SPC) in production and calculating the process capability index to determine the manufacturing ability to meet the product’s quality requirements. To a large extent, the ability of a process to meet the requirements was determined by the location of the process or the mathematical expectation of the controlled quality characteristic value. Process setup center variability within the boundaries of the Shewhart control chart of the average values was supposed to be the natural state for a statistically controlled process. However, the calculation of the process capability index did not consider the possibility of a shift in the actual value of the process setup center for a controlled characteristic from its mathematical expectation. It was proposed to adjust the process capability index for the setup center’s possible deviation. It demonstrated the possibility of critical errors in determining the ability of a production process to meet requirements without considering the process setup center. The effectiveness of the proposed solutions was also demonstrated by the example of determining the ability of the welding wire manufacturing process to meet the requirements for metal yield strength of the welded joint of metal bridge span constructions.
Appears in Collections: Journal of Engineering Sciences / Журнал інженерних наук

Views

Ukraine Ukraine
89
United States United States
111

Downloads

India India
1
Morocco Morocco
1
South Korea South Korea
1
Ukraine Ukraine
68
United States United States
201

Files

File Size Format Downloads
Haievskyi_jes_2_2023.pdf 425,17 kB Adobe PDF 272

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.